Break of gauge: Difference between revisions

From Citizendium
Jump to navigation Jump to search
imported>George Swan
(fix refs)
m (Text replacement - "[[US Department of" to "[[U.S. Department of")
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
{{subpages}}
{{subpages}}
When railways have lines whose rails employ two or more different guages the '''break of gauge''' is the location where two lines meet.<ref name=DotAustralia/>
When railways have lines whose rails employ two or more different guages the '''break of gauge''' is the location where two lines meet.<ref name=DotAustralia>
 
While some railways cope with a change in gauge by unloading the cargo from the cars of one train, and reloading it one the cars of another train, of the other gauge, there are some more automated solutions.
Some systems have a facility to rapidly substitute cars' [[bogies]] with alternate bogies of the alternate gauge.
 
==References==
{{Reflist}}
<ref name=DotAustralia>
{{cite news  
{{cite news  
| url        = http://mcsac.fmcsa.dot.gov/documents/Sept2010/Heavy_Vehicle_Driver_Fatigue_Australia.pdf
| url        = http://mcsac.fmcsa.dot.gov/documents/Sept2010/Heavy_Vehicle_Driver_Fatigue_Australia.pdf
| title      = Heavy Vehicle Driver Fatigue Reform In Australia
| title      = Heavy Vehicle Driver Fatigue Reform In Australia
| publisher  = [[US Department of Transport]]
| publisher  = [[U.S. Department of Transport]]
| author      =  
| author      =  
| date        =  
| date        =  
Line 24: Line 17:
}}
}}
</ref>
</ref>
}}
 
While some railways cope with a change in gauge by unloading the cargo from the cars of one train, and reloading it one the cars of another train, of the other gauge, there are some more automated solutions.
Some systems have a facility to rapidly substitute cars' [[bogies]] with alternate bogies of the alternate gauge.
 
==References==
<references/>

Latest revision as of 11:56, 10 February 2023

This article is a stub and thus not approved.
Main Article
Discussion
Related Articles  [?]
Bibliography  [?]
External Links  [?]
Citable Version  [?]
 
This editable Main Article is under development and subject to a disclaimer.

When railways have lines whose rails employ two or more different guages the break of gauge is the location where two lines meet.[1]

While some railways cope with a change in gauge by unloading the cargo from the cars of one train, and reloading it one the cars of another train, of the other gauge, there are some more automated solutions. Some systems have a facility to rapidly substitute cars' bogies with alternate bogies of the alternate gauge.

References