Moss Park station: Difference between revisions

From Citizendium
Jump to navigation Jump to search
(fixing link to Moss Park (Toronto))
mNo edit summary
 
(4 intermediate revisions by one other user not shown)
Line 1: Line 1:
{{subpages}}
{{subpages}}
[[File:Moss_Park_Aurmoury,_NW_corner_of_Queen_Street_East_and_Jarvis,_2022_05_17_(52080905251).jpg | thumb | excavation of Moss Park station will require cutting down the large mature trees on the Northeast corner of Jarvis and Queen.]]
[[File:Moss_Park_Aurmoury,_NW_corner_of_Queen_Street_East_and_Jarvis,_2022_05_17_(52080905251).jpg | thumb | excavation of Moss Park station will require cutting down the large mature trees on the Northeast corner of Jarvis and Queen.]]
One of the stations on [[Toronto]]'s new [[Ontario Line]] will be named '''Moss Park''', after [[Moss Park (Toronto)|Moss Park]], the park where it will be built, between  [[Jarvis Street, Toronto|Jarvis Street]] and [[Sherbourne Street, Toronto|Sherbourne Street]], on [[Queen Street, Toronto|Queen Street]].<ref name=blogto2021-06/>
'''Moss Park station''' will be one of the stations on [[Toronto, Ontario]]'s new [[Ontario Line]].  It was renamed after [[Moss Park (Toronto)|Moss Park]], the park where it is to be built, between  [[Jarvis Street, Toronto|Jarvis Street]] and [[Sherbourne Street, Toronto|Sherbourne Street]], on [[Queen Street (Toronto)]].<ref name=blogto2021-06/>


The station itself will be built using the [[cut and cover]] construction technique, while the tunnels feeding it will be bored through bedrock at a depth of approximately 35 meters.
The station itself will be built using the [[cut and cover]] construction technique, while the tunnels feeding it will be bored through bedrock at a depth of approximately 35 meters.
Line 89: Line 89:
}}
}}
</ref>
</ref>
}}
}}[[Category:Suggestion Bot Tag]]

Latest revision as of 11:01, 21 September 2024

This article is a stub and thus not approved.
Main Article
Discussion
Related Articles  [?]
Bibliography  [?]
External Links  [?]
Citable Version  [?]
 
This editable Main Article is under development and subject to a disclaimer.
excavation of Moss Park station will require cutting down the large mature trees on the Northeast corner of Jarvis and Queen.

Moss Park station will be one of the stations on Toronto, Ontario's new Ontario Line. It was renamed after Moss Park, the park where it is to be built, between Jarvis Street and Sherbourne Street, on Queen Street (Toronto).[1]

The station itself will be built using the cut and cover construction technique, while the tunnels feeding it will be bored through bedrock at a depth of approximately 35 meters.

The announcement of the station has triggered the redevelopment of older properties.[1]

Connection to the 501 Queen Streetcar

The 501 Queen streetcar route is the longest streetcar route in North America, and riders will be able to transfer to and from this route at five Ontario Line stations, including Moss Park.[1] The other stations are at Queen Spadina Station, Osgoode Station, Queen Station and Leslieville Station.

References

  1. 1.0 1.1 1.2 Lauren O'Neil. Locations revealed for 4 new subway stations in downtown Toronto, Blog TO, June 2021. Retrieved on 2022-05-18. “A brand new subway station at Sherbourne and Queen will "connect a dense and fast-growing area of the city to the subway network" with an estimated 7,300 people expected to use the brand new Moss Park station during the rush hour.”