Capability Maturity Model Integration: Difference between revisions
Jump to navigation
Jump to search
imported>Mark Jones (Stub article started) |
imported>Aleksander Stos m (cz live ++) |
||
Line 7: | Line 7: | ||
==References== | ==References== | ||
{{Reflist}} | {{Reflist}} | ||
[[Category: CZ Live]] |
Revision as of 12:54, 28 October 2007
The Capability Maturity Model® Integration (CMMI) was created by the Software Engineering Institute (SEI) as a process improvement approach that provides organizations with the essential elements of effective processes. It can be used to guide process improvement across a project, a division, or an entire organization. [1]
The CMMI helps integrate traditionally separate organizational functions, set process improvement goals and priorities, provide guidance for quality processes, and provide a point of reference for appraising current processes.
The CMMI supercedes the Capability Maturity Model (CMM), its predecessor, and organizations using the CMM are encourages to upgrade to the CMMI. [2]
References
- ↑ Capability Maturity Model Integration at the SEI website.
- ↑ Capability Maturity Model Now-defunct predecessor to the CMMI.