Break of gauge: Difference between revisions
Jump to navigation
Jump to search
imported>George Swan (add reference) |
imported>George Swan (fix refs) |
||
Line 6: | Line 6: | ||
==References== | ==References== | ||
{{Reflist | {{Reflist}} | ||
<ref name=DotAustralia> | <ref name=DotAustralia> | ||
{{cite news | {{cite news | ||
Line 25: | Line 24: | ||
}} | }} | ||
</ref> | </ref> | ||
}} |
Revision as of 01:45, 6 July 2014
When railways have lines whose rails employ two or more different guages the break of gauge is the location where two lines meet.[1]
While some railways cope with a change in gauge by unloading the cargo from the cars of one train, and reloading it one the cars of another train, of the other gauge, there are some more automated solutions. Some systems have a facility to rapidly substitute cars' bogies with alternate bogies of the alternate gauge.
References
- ↑ Cite error: Invalid
<ref>
tag; no text was provided for refs namedDotAustralia
[1] }}
- ↑ Heavy Vehicle Driver Fatigue Reform In Australia, US Department of Transport. Retrieved on 2014-07-.